The flat floor work for the Hyundai Motor Manufacturing Indonesia (HMMI) project at GIIC - Deltamas, Cikarang, West Java, took place from September 2020 to May 2021. The project involved PT HEIN Indonesia as the main contractor, with subcontractors such as Takenaka, IRS Construction, PT Pendawa Lestari Perkasa, and Eljindo. PT Pendawa Lestari Perkasa was entrusted to provide solutions for the industrial floor with FM 3 flat floor specifications.
INDUSTRIAL
ApexCrete™
ApexCrete™ is expertly formulated by our seasoned professionals,
utilizing high-quality materials and advanced equipment, including
laser screed and 3D profiler technology, to deliver an integrated solution
for your industrial flooring needs. ApexCrete™ adheres to the highest
standards, including SNI 2847:2013, Concrete Society Technical Report
34 Edition 4:2014, ASTM E 1155 M, and EN 15620.
ApexCrete™ Superflat Floor Services:
- •Big Panel System
•Long Strip Panel System
•Joint-Less Floor System
•Cold Storage Floor System
![](https://solusibangunindonesia.com/wp-content/uploads/2024/11/apexcrete.png)
Portofolio
Flat Floor Work for Hyundai Motor
Manufacturing Indonesia Project (HMMI)
![Apexcrete portofolio-1](https://solusibangunindonesia.com/wp-content/uploads/2024/11/Apexcrete-portofolio-1.png)
Flat Floor Work for IKEA Bandung
The flat floor project for IKEA Bandung in Kota Baru Parahyangan, West Java, was carried out in 2020. The project was owned by IKEA Indonesia, with PT Total Bangun Persada as the main contractor and PT Pendawa Lestari Perkasa as the floor subcontractor. PT Pendawa Lestari Perkasa was selected through a tender to supply a floor with FF 35 flat floor specifications, ensuring high-quality standards to meet the project’s needs.
![Apexcrete portofolio-2](https://solusibangunindonesia.com/wp-content/uploads/2024/11/Apexcrete-portofolio-2.png)
Flat Floor Expansion for Diamond
Cold Storage PT Sukanda Djaya
The flat floor work for Diamond Cold Storage at the MM2100 Industrial Estate, Bekasi, began on September 20, 2022, with completion expected by March 2023. This project, owned by PT Sukanda Djaya, involves PT Tokyu Construction Indonesia with consulting by PT Indoswissatama. With FM2 and FM3 flat floor specifications, ApexCrete, Laser Screed, and the Big Panel method were employed to ensure high-quality flooring.
![Apexcrete portofolio-3](https://solusibangunindonesia.com/wp-content/uploads/2024/11/Apexcrete-portofolio-3.png)
Brochure
Integrated Solutions
for Industrial Flooring
![](https://solusibangunindonesia.com/wp-content/uploads/2024/11/brosur-apexcrete.png)